grinding of wood chips and waste,
Additive dosing to the fiber,
Fiber packaging,
fiber sealing in the turbo sealer,
board forming,
loading into the dryer, unloading of dried boards,
transport of plates to the formatting machine,
component management,
dust removal system
ventilation and temperature stabilization of the production hall.
Scope of work:
project,
software,
Initiation,
Applied PLC controllers, terminals, communication, visualization systems:
2 central controllers S7-315-2DP and S7-318-2DP,
Distributed input/output structure on the site – 7 stations on PROFIBUS DP,
OP37 graphical terminal,
PROFIBUS FMS communication, PROFIBUS DP, MPI, RS485, CANBUS,
2 stanowiska z systemem wizualizacji procesu produkcji PROCON-Win
List of controlled, measuring, and monitoring devices:
650 binary signals,
40 analog signals,
12 software-based PID controllers,
31 motors with variable speed control,
110 motors with direct drive,
20 control valves