Unwinding of casings.
Control of the shirring head.
Control of the main carriage in terms of path and casing length.
Control in the technological sequence of the spindle, grippers, saw, and lubrication.
Scope of work:
oprogramowanie,
Initiation,
Applied PLC controllers, terminals, communication, visualization systems:
Siemens S5-115 PLC controller.
OP-7 text terminal.
Summary of controlled and measurement devices, control systems:
72 binary signals and variables.
8 analog signals and variables.
2 motors with adjustable speed.
3 motors with direct drive.
10 solenoid valves.