Conversion of control based on the S5 controller to S7-300 and replacement of the old visualization system with a new one. The technological line carries out the pipe shot blasting process.
Pipe intake,
heating,
shot blasting,
cleaning and transferring the pipes for further processing,
Scop of work:
project,
software,
Initiation,
Applied PLC controllers, terminals, communication, visualization systems:
S7-300 PN/DP controller,
distributed input/output structure on the site – 4 Interbus stations,
TP277 graphical terminal,
PROFIBUS DP, INDUSTRIAL ETHERNET, and INTERBUS communication,
1 workstation with the ZenOn production process visualization system.
Summary of controlled and measurement devices, control systems:
380 binary signals,
18 analog signals,
15 motors with adjustable speed,
20 direct drive motors,