Reconstruction of the in-house water treatment station:
introduction of a two-stage water pumping system,
control of pump performance by adjusting their speed based on level and pressure,
control of filters (filtration, periodic backwashing in a specified sequence),
The result of the reconstruction is an improvement in water quality and a reduction in electricity costs.
introduction of a two-stage water pumping system,
control of pump performance by adjusting their speed based on level and pressure,
control of filters (filtration, periodic backwashing in a specified sequence),
The result of the reconstruction is an improvement in water quality and a reduction in electricity costs.
Scope of work:
project,
software,
Initiation,
Applied PLC controllers, terminals, communication, and visualization systems:
S7-300 controller with a 315-2DP processor,
GSM module for notifying the operator about disturbances.
TP270 operator panel.
List of controlled, measuring, and control devices:
80 binary signals,
20 analog signals
3 software PID controllers
4 motors with adjustable speed.
15 direct-drive motors,
5 control valves,
3 level measurement systems
1 flow measurement system
3 pressure measurement systems.