Implementation

The automation system developed in the previous stages is installed. Each element of the project is tested and launched. The ANIRO Engineer who will conduct training for employees remains at the Client’s disposal.

The engineering service is carried out in stages:
  

kwadrat Completion of devices and apparatus for the needs of the automation system.
kwadrat Mechanical and electrical assembly of switchgears, cabinets and control panels.  
kwadrat PLC programming.
kwadrat Visualization, monitoring, supervision and archiving of HMI / SCADA production processes.
kwadrat Implementation of complex applications of AC, DC and servo drive systems.  
kwadrat Conducting cable and connecting works on the site.
kwadrat Starting the automation system, supervising the achievement of production efficiency.